The use of Remeha products in a HydroTop is a first for both DHPS and Remeha. This did require the necessary modifications, says Wilhard Oldengarm. "We had to make everything fit properly on both the Elga and the Mercuria. For this, Feenstra delivered the exterior parts from Remeha to our factory in Deventer. We prepared these completely so that all parts fit into the HydroTop. Ultimately this resulted in a prefab solution, which we could install directly into the roof at the project site.
In the Twente municipality of Tubbergen, 63 homes underwent a major sustainability upgrade. The client is Woningstichting Tubbergen. The project represents a first for Remeha. Together with the client, they opted to install a significant proportion of the heat pumps via the prefabricated HydroTop solution.
Read more about this project on the DHPS projects page.
.png?width=223&height=58&name=HTW-logo-horizontaal%20(3).png)